Torrance
ADU Requirements
- # Of Units Allowed In R-1 Zone
- 1
- # Of Units Allowed In Multi-Family Zone
- 2
- Minimum Required Lot Size
- over 800 sq. ft. triggers lot coverage
- Minimum ADU Size
- 150
- Maximum ADU Size
- 1,000
- ADU Setbacks
- 4 foot side and rear setbacks, 6 ft. building to building
- Owner Occupancy Required?
- Parking Requirements
- parking exemption or 1 parking per ADU
- Can ADU Be Attached To Main House?
- JADU, SB-9
- Can ADU Have Separate (New) Address?
- Can ADU Sold Separately From Main House?
- no
- Can Unit Have Kitchen?
- yes
- Can Unit Have Bathroom?
- yes
- Can Unit Have Separate Entrance?
- yes
- Electrical Meter Required?
- Water Meter Required?
- Gas Meter Required?
- Solar Panels Required?
- Fire Sprinkler System Required?